A retaining wall in Storrs that is bulging or leaning almost always has a drainage problem, not a stone problem. Soil behind a wall is heavy; saturated soil is far heavier and behaves more like a fluid. Add a New England winter and you get frost pressure on top of that, water in the backfill freezes, expands and pushes the wall outward a little each cycle. It never pushes it back. Over a decade of winters, a wall built without drainage walks steadily downhill.
That is why a proper rebuild spends most of its budget on things you will never see: a compacted gravel base below frost depth, free-draining crushed stone backfill instead of native clay, filter fabric so silt does not clog it, a perforated drain pipe at the base daylighting to somewhere sensible, and weep holes through a mortared wall. A dry-laid wall gets batter, a deliberate lean back into the slope, and geogrid reinforcement into the retained soil for taller segments.
Short dry-laid walls that have simply shed a few stones can often be reset. A mortared wall that has cracked through, a wall that has rotated at the top, or any wall with a visible belly generally needs to come down and go back up with proper backfill, patching the face leaves the cause untouched, and it will move again the following spring. Many Connecticut towns require a permit and an engineered design above a threshold height, commonly around four feet, and the threshold and review process are set locally, so check with the Storrs building department rather than assuming.
Around Storrs you will also see older walls of dry-laid fieldstone and, in places, brownstone, these are worth restoring properly rather than replacing with segmental block, and a mason who works with stone will tell you frankly which stones are still sound. Ask any contractor for a written scope that names the base depth, the backfill material, the drain and the geogrid. If those are missing from the quote, they are missing from the wall. Confirm the contractor holds a current Home Improvement Contractor registration with the Connecticut Department of Consumer Protection.